Project overview
Surface preparation and painting final finish to parking levels P1 and P2.
Full principal contractor service
Single point of responsibility from start to handover.
Full-time onsite supervision
Engineers on site for the duration of the works.
Delivered to specification
Inspected at each hold point with the consultant.


